Our Projects
Foundation & Piling Projects
Real bored and driven piling projects in Chonburi, Si Racha, Bang Lamung, Pattaya, Rayong and Chachoengsao — covering drilling, driving, testing and additional services.
Popular Projects
Top 10 Most Viewed Projects
Showing 12 of 70 projects
Driven Piling Work, Mueang Chachoengsao District, Chachoengsao Province
Project Details Location: Mueang Chachoengsao District, Chachoengsao Province Type of Work: Building Scope of Work: Drive piles according to positions and depths specified in construction drawings to support building structure Specifications: I-piles 0.22x0.22x24.00 m and I-piles 0.26x0.26x24.00 m Quantity: 138 piles Work Period: 24/04/2569-09/06/2569 Machinery Used: 1 tripod crane
Driven Piling Work, Building/Factory, Pluak Daeng District, Rayong Province
Project Details Location: Pluak Daeng District, Rayong Province Type of Work: Building/Factory Scope of Work: Drive piles according to positions and depths specified in construction drawings to support building/factory structure Specifications: Piles [] 0.45x0.45x7.50 m and Piles [] 0.45x0.45x7.00 m Quantity: 137 piles Work Period: 22/10/2568-03/11/2568 Machinery Used: 1 track crane
Bored Piling Work, UFM Project, Bo Thong District, Chonburi Province
Project Details Location: UFM Project, Bo Thong District, Chonburi Province Type of Work: Building/Factory Scope of Work: Bored piling for foundation to support factory building construction Specifications: Bored piles diameter 35 cm, depth 5 and 6 m, 12 mm deformed rebar 6 bars, 6 mm stirrups @20 cm, concrete 280 Cu Quantity: 586 piles Work Period: 19/01/2568-06/03/2568 Machinery Used: 3 track drills, 1 rubber-tired drill
Bored Piling Work, ARDA SMART Project, Amata City Rayong, Pluak Daeng District, Rayong Province
Project Details Location: ARDA SMART Project, Amata City Rayong, Map Yang Phon Subdistrict, Pluak Daeng District, Rayong Province Type of Work: Building/Factory Scope of Work: Bored piling for foundation to support factory building structure erection Specifications: Bored piles diameter 35 cm, depth 5 and 6 m, 12 mm rebar 6 bars, 9 mm stirrups @20 cm, concrete 280 Cu Quantity: 863 piles Work Period: 01/12/2567-24/01/2568 Machinery Used: 3 track drills
Bored Piling at Wasin Market, Bo Win Subdistrict, Si Racha District, Chonburi
Project Details Location: Wasin Market, Bo Win Subdistrict, Si Racha District, Chonburi Type of Work: Building/House Scope of Work: Bored piling for foundation to support the structural erection of a residential building Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 23 piles Working Period: 18/03/2569 Machinery Used: 1 track-mounted drilling rig, 1 rubber-tyred drilling rig
Bored Piling at Phoenix Golf Course, Bang Lamung District, Chonburi
Project Details Location: Phoenix Golf Course, Bang Lamung District, Chonburi Type of Work: Building Scope of Work: Bored piling at positions and depths specified in the construction drawings to support the building foundation structure within the golf course area Specifications: Bored piling diameter 35 cm., depth 6 and 8 m., bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 280 Cu and bored piling diameter 50 cm., depth 6 and 8 m., bar 16 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 280 Cu Quantity: 158 piles Working Period: 10/02/2568-19/02/2568 Machinery Used: 2 track-mounted drilling rigs
Bored Piling at Map Prachan Reservoir, Bang Lamung District, Chonburi
Project Details Location: Map Prachan Reservoir, Pong Subdistrict, Bang Lamung District, Chonburi Type of Work: Warehouse/Factory Scope of Work: Bored piling for foundation to support the structural erection of a factory warehouse Specifications: Diameter 35 cm., depth 4 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Working Period: 14/06/2568-22/01/2569 Quantity: 279 piles Machinery Used: 2 track-mounted drilling rigs
Pre-boring Piling at Chaiyaphruek Public Park, Bang Lamung District, Chonburi
Project Details Location: Chaiyaphruek Public Park, Bang Lamung District, Chonburi Type of Work: Building/Roof Structure Scope of Work: Pre-boring pile positions for building extension structure Specifications: Diameter 35 cm., depth 5 m. Quantity: 20 piles Working Period: 22/05/2569 Machinery Used: 1 rubber-tyred drilling rig
Pre-boring Piling at Technic Pattaya, Bang Lamung District, Chonburi
Project Details Location: Technic Pattaya, Bang Lamung District, Chonburi Type of Work: Building/Housing Project Scope of Work: Pre-boring pile positions for building structure Specifications: Diameter 35 cm., depth 5 m. Quantity: 69 piles Working Period: 14/05/2569-24/05/2569 Machinery Used: 1 rubber-tyred drilling rig
Bored Piling at AODU Project, Nikhom Phatthana, Rayong
Project Details Location: AODU Project, Nikhom Phatthana, Rayong Type of Work: Warehouse/Factory Scope of Work: Bored piling for foundation to support the structural erection of a factory warehouse Specifications: Diameter 35 cm., depth 4 m., deformed bar 12 mm. 6 bars, stirrup 9 mm.@20 cm. Quantity: 82 piles Working Period: 24/01/2569-10/02/2569 Machinery Used: 1 track-mounted drilling rig
Bored Piling at Nong Pla Lai Subdistrict, Bang Lamung District, Chonburi
Project Details Location: Nong Pla Lai Subdistrict, Bang Lamung District, Chonburi Type of Work: Warehouse/Factory Scope of Work: Bored piling for foundation to support the construction of a cement factory warehouse Specifications: Diameter 35 cm., depth 8.30 m., deformed bar 12 mm. length 8.50 m. 6 bars, stirrup 6 mm.@20, concrete 240 Cu, pull Dowel bars protruding above the floor 20 cm. Quantity: 49 piles Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20, concrete 240 Cu Quantity: 131 piles Working Period: 06/10/2568-22/02/2569 Machinery Used: 1 rubber-tyred drilling rig
Bored Piling at Kwang Ya Project, Bang Lamung District, Chonburi
Project Details Location: Kwang Ya Project, Nong Prue Subdistrict, Bang Lamung District, Chonburi Type of Work: Warehouse/Factory Scope of Work: Bored piling for foundation to support the structural erection of a factory warehouse Specifications: Diameter 35 cm., depth 5.5 m., deformed bar 12 mm. 6 bars, stirrup 9 mm.@20 cm., concrete 280 Cu Quantity: 320 piles Working Period: 03/02/2569-17/03/2569 Machinery Used: 3 track-mounted drilling rigs, 1 rubber-tyred drilling rig